Campaign delivery
Specs, loudness, cutdowns, captions and clearance: what a finished ad needs before it airs.
Send a brief
5 articles
Newest issue first. Issue dates follow the editorial calendar; each article also shows the date it was published.
Issue:
Getting a TV commercial cleared: Ad-ID, claim support and network review
TV commercial clearance in the US: how network standards review works, what an Ad-ID code is, and the claim substantiation file to build before you shoot.
Issue:
Captions and audio description for video ads: rules and delivery
Audio description for videos and captions in ads: what FCC rules, WCAG 2.2, Section 508 and ad platforms require in the US, and which files to deliver.
Issue:
Cutting down a 30-second spot: 15s, 6-second bumpers and vertical versions
6 second bumper ads and 15s cutdowns rarely work as plain trims of a 30. Google's length bands, what to plan on set, vertical crops and when to shoot native.
Issue:
Loudness for TV and streaming ads: the CALM Act and -24 LKFS
CALM Act loudness rules bind TV stations and cable, not apps. What -24 LKFS means, California's 2026 streaming law and which mixes to order for each outlet.
Issue:
CTV ad specs: one master file, many publisher requirements
CTV ad specs differ by publisher. Build one ProRes master, then MP4 renditions, a VAST tag and an Ad-ID that pass DV360, Hulu, Roku and NBCU checks.
A spot is not finished when the edit is locked. It still has to become the files each destination accepts: the right frame size, frame rate, codec and file size; a mix at the loudness the network or platform expects; cutdowns and vertical versions that still make sense; captions and, where they help, audio description; and for broadcast, a clearance process with its own identifiers and claim support.
The articles in this section work through those steps with current specifications from the platforms and standards bodies that publish them, each with the date it was checked, because specs change. They also show how a deliverable matrix keeps the number of files under control.
For what a handover should contain, see deliverables. Before export, run through the delivery specs checklist.