Production budget worksheet
Line items by category with a contingency, editable in your browser and exportable as CSV.
Send a brief- Use it for
- A line-item budget you can hand to finance
- Structure
- Quantity, unit and rate on every line
- Example total
- $61,094, an illustration, not a price
- Export
- CSV or print; nothing leaves your browser

Worksheet
The rows are the fictional Orlenna example budget; the rates are illustrations, not Blendpipe prices or market rates. Edit them, add your own lines and download the result as CSV. Nothing leaves your browser.
| Line item | Category | Quantity | Unit | Rate ($) | Line total | Remove |
|---|---|---|---|---|---|---|
| $3,000 | ||||||
| $4,200 | ||||||
| $9,500 | ||||||
| $2,800 | ||||||
| $1,200 | ||||||
| $6,300 | ||||||
| $2,400 | ||||||
| $9,600 | ||||||
| $8,400 | ||||||
| $1,500 | ||||||
| $2,500 | ||||||
| $4,140 |
Results
- Lines counted
- 12
- Development
- $7,200
- Live action
- $13,500
- Animation
- $6,300
- 3D
- $12,000
- Post
- $8,400
- Talent
- $1,500
- Rights
- $2,500
- Versions
- $4,140
- Subtotal
- $55,540
- Contingency
- $5,554
- Total
- $61,094
A production budget is easier to discuss when every cost sits on its own line with a quantity, a unit and a rate. This worksheet gives you twelve such lines in eight categories, a contingency percentage and totals that update as you type. Download it as a CSV or print it.
The rates filled in are illustrations, not Blendpipe prices and not market rates. They come from the fictional Orlenna example so the arithmetic works. Replace every rate with a quote you hold or a figure you have paid before relying on the total.
How the worksheet works
Each line multiplies quantity by rate. The unit says what the quantity counts: a flat fee, a day, a second of animation, a shot or a version. Lines add up by category, categories add up to the subtotal, and contingency is a percentage of the subtotal. Use Add a line for costs the example leaves out and Remove for lines that do not apply.
The eight categories
- Development. Everything before production is committed: the plan and treatment, script, storyboards, style frames and animatic.
- Live action. Crew per shoot day; camera, lighting and grip per day; one line for locations, permits and insurance. That last line depends on where you film: in Colorado Springs, private property needs only the owner’s permission, while a city park needs a permit ($250 per day, $500 at Garden of the Gods) and a $1,000,000 certificate of insurance naming the city. See Colorado Springs.
- Animation. Usually costed per finished second, because the work grows with screen time.
- 3D. Keep the model apart from the shots: the model is built once from the product drawings, and each shot then needs its own look development, lighting and rendering (render time calculator).
- Post. Edit, color, sound design and mix, costed by the day.
- Talent. Voiceover and on-camera performers, with session fees and the usage term they are paid for.
- Rights. Music and other licensed assets. A commercial recording needs licenses from both the composition owner and the recording owner, according to the US Copyright Office.
- Versions. Every deliverable beyond the hero master: cutdowns, aspect ratios and languages.
The Orlenna example, line by line
Example (fictional). Orlenna is an invented brand, not a client. Every rate is an illustration.
| Category | Lines (quantity x rate) | Total |
|---|---|---|
| Development | Production plan and treatment, 1 flat x $3,000; storyboards and animatic, 1 flat x $4,200 | $7,200 |
| Live action | Crew, 1 day x $9,500; camera, lighting and grip, 1 day x $2,800; location, permits and insurance, 1 flat x $1,200 | $13,500 |
| Animation | 2D animation, 14 seconds x $450 | $6,300 |
| 3D | 3D model from product drawings, 1 flat x $2,400; 3D shots, 3 x $3,200 | $12,000 |
| Post | Edit, color and sound, 6 days x $1,400 | $8,400 |
| Talent | Voiceover talent and session, 1 flat x $1,500 | $1,500 |
| Rights | Music license, 1 flat x $2,500 | $2,500 |
| Versions | Extra versions, 23 x $180 | $4,140 |
Twelve lines give a subtotal of $55,540. Contingency at 10% adds $5,554, for a total of $61,094.
The quantities come from the plan. The 14 seconds of animation are where drawn elements appear on the example blend map (shots 2, 3, 5 and 7). The three 3D shots are the exploded view, the blended trail shot and the packshot. The 23 extra versions are the 24 deliverables (3 lengths x 4 ratios x 2 languages) minus the hero master, as the versioning matrix calculator counts them.
The video budget calculator leaves out the development, 3D model and voiceover lines and reaches $48,884; the $12,210 difference is those lines ($11,100) plus their contingency ($1,110).
Contingency
Contingency is money held for things that are likely but not yet known: a weather day, an extra render pass after notes, a re-recorded line. It is not a markup. Keep it as one visible line rather than padding each rate, so everyone can see it. Ten percent is the example value; set yours by how much of the plan is still uncertain, and write down who decides when to use it.
Common mistakes
- Pricing versions at zero. Every reframe, language and cutdown takes edit and checking time. The example’s 24 deliverables take 22.0 hours at 45 minutes of edit and 10 minutes of checks each.
- Leaving out on-camera talent. The Orlenna rows include a voiceover but no line for the runner on screen. Add the fee and the usage term, and track renewals with the usage term calculator.
- One line for all 3D. Without a separate model line, a fourth shot looks as if it needs a second model.
- Rates without assumptions. Write the assumption beside the rate (crew size, hours per day, review rounds), or the line cannot be compared with a quote.
- Missing categories. Travel, extra insurance and media buying are not in the example. Add them if your project carries them.
What to do next
Replace the example rates with your own and keep the CSV beside the shot list worksheet, so each costed second matches a planned shot. When you send a brief, include a budget range: the production plan you receive includes a line-item estimate in this structure, with assumptions and contingency written out. Engagements shows how the lines change by project type.