Video budget calculator
A line-item ad budget from your own rates, with each category's share and a contingency.
Send a brief- You enter
- Your own rates and quantities for each line
- You get
- Category totals, shares, subtotal, contingency, total
- Example total
- $48,884, an illustration, not a price
- Runs
- In your browser; nothing is sent

Calculator
A mixed-media ad has a different cost shape from a pure shoot or a pure animation: some seconds are filmed, some drawn, some rendered, and every extra version adds work. This calculator builds a line-item budget from rates and quantities you enter, so you can see which part of the plan carries the money and test what changes when a shot moves from one medium to another.
The values filled in are illustrations, not Blendpipe prices or market rates. They exist so the example adds up. Replace every rate with a quote you hold or your own figure before you rely on the total.
How to use it
Enter a quantity and a rate for each line. A line you do not need can be set to zero.
- Live action. Shoot days; crew cost per shoot day (director, camera, lighting, grip, sound and production staff); camera, lighting and grip rental per shoot day; and one total for locations, permits and insurance.
- 2D animation. Seconds of drawn animation and a cost per second. Count every second where drawn elements appear, including lines and type composited over live action.
- 3D. The number of 3D shots and a cost per shot covering modeling, look development, lighting and rendering for one shot.
- Edit, color and sound. Post days and a cost per day.
- Versions. Extra versions beyond the hero master (cutdowns, aspect ratios and languages) and a cost per version.
- Music. The license total for the track.
- Contingency. A percentage of the subtotal, up to 50.
How the calculation works
- Live action = shoot days x (crew per day + equipment per day) + locations total.
- 2D animation = seconds x cost per second.
- 3D = shots x cost per shot.
- Edit, color and sound = post days x cost per day.
- Versions = extra versions x cost per version.
- Subtotal = the five lines above + music.
- Contingency = subtotal x percentage. Total = subtotal + contingency.
- Each line’s share is its amount divided by the subtotal, rounded to a whole percent.
The worked example
Example (fictional). The Orlenna Ridge Bottle hero spot, with illustrative rates that are not Blendpipe prices or market rates. The quantities come from the plan: one shoot day, 14 seconds with drawn elements, three 3D shots (the exploded view, the blended shot and the packshot), six post days and 23 versions beyond the hero master.
| Line | Calculation | Amount | Share |
|---|---|---|---|
| Live action | 1 day x ($9,500 + $2,800) + $1,200 | $13,500 | 30% |
| 2D animation | 14 s x $450 | $6,300 | 14% |
| 3D | 3 shots x $3,200 | $9,600 | 22% |
| Edit, color and sound | 6 days x $1,400 | $8,400 | 19% |
| Versions | 23 x $180 | $4,140 | 9% |
| Music | License total | $2,500 | 6% |
| Subtotal | $44,440 | ||
| Contingency | 10% | $4,444 | |
| Total | $48,884 |
Reading the result
The shares matter more than the total. In the example, the single shoot day is the largest line at 30 percent, and 3D is next at 22 percent. That is where a plan decision moves the most money: a second shoot day adds $12,300 before contingency at these illustrative rates, while one more 3D shot adds $3,200.
The versions line is easy to underestimate. Twenty-three versions at $180 each is $4,140, nearly half the post line. The versioning matrix calculator shows where that count comes from and what it costs in hours.
Contingency covers the unknowns inside the agreed scope, such as weather on a shoot day or a render that needs another pass. It is not a fund for adding deliverables later; a change of scope is a new line.
Limits
- Talent, travel and media buying have no line. Add them to the nearest line or use the worksheet. Insurance is counted only if you include it in the locations total.
- Development (treatment, storyboards, animatic), a 3D model build and voiceover are not separate lines here. The production budget worksheet adds them: in the fictional example, development ($7,200), a 3D model ($2,400) and voiceover ($1,500) bring the subtotal to $55,540, the contingency to $5,554 and the total to $61,094.
- Per-second and per-shot rates hide a lot of variation. A second of character animation and a second of animated type are not the same work, and neither are a packshot and an exploded view.
- The calculator does not know your market, your union terms or your schedule. A rush, a remote location or union talent changes the rates you should enter.
Related decisions
The live action and 3D lines are often the trade-off in a mixed-media plan; the render time calculator estimates the machine time behind the 3D line. The engagement types show how scope changes between a single spot, a launch campaign and a versioning job, and the example campaign shows the full Orlenna plan these numbers come from.
When you send a brief, include a budget range rather than a single number. The production plan comes back with a line-item estimate, its assumptions and its contingency, shaped to that range.